Stonebridge
Builders
Nyack, NY · Lic. H-22-0000-00Call the office(845) 555-0172

General contractor · Nyack, New York · Est. 1995

Thirty-one years,
one uncompromising standard.

A small Nyack firm on purpose. Additions, kitchens, baths, and the structural work underneath them, fully insured with 54 five-star reviews. The person whose name is on the company is on your job site every week it runs.

Building since
1995
31 years
Google reviews
54
Rockland County
License
H-22
Fully insured
A two-story house under construction, full wood framing against a clear blue sky
Framing, mid-buildSample photo
DATUM +0'-0"How the firm is built

The reason to hire us is the reason we stay small

A builder can only be in one place at a time. So we do not pretend otherwise.

Most of the horror stories start the same way: the firm took on more than it could walk. Crews vanish for a week. The schedule slides and nobody calls. We built Stonebridge to make that impossible, by keeping the company small enough to run from a truck and a set of drawings.

  • 01

    A few at a time

    We run three or four projects at once, not thirty. That is the whole reason the schedule holds.

  • 02

    The principal walks it

    Not a project manager you never meet. The owner is on your job every week, every week it runs.

  • 03

    The same carpenters

    Not a new crew of subs each phase. The people who start your house are the people who finish it.

  • 04

    The schedule is the schedule

    The dates we give you at contract are the dates we keep. If something moves, you hear it from us first.

Two carpenters framing a wall on a job site, working from the top plate
The same crew, every phase. Framers who will hang your doors.Sample photo
DATUM +0'-0"The arc of a build

Ground up

A house is built in an order. So is a good one, just more carefully.

This is every project we take, start to finish. Read it from the ground and watch it rise.

  1. 01LayoutEL. +0'-0"

    It starts as string lines on dirt.

    Before a footing gets poured we stake the corners, pull the diagonals square, and set the batter boards. Get this wrong and every wall after it is wrong. We take the time here so we never chase it later.

    Batter boards and string lines laying out a foundation footprint on a hillside lot at dusk, valley view beyondLayout · Sample photo
  2. 02FrameEL. +9'-0"

    The frame goes up true.

    Every stud plumb, every plate level, every header sized for the load above it. This is the bones of the house and the part nobody sees once the drywall is on. We build it like the inspector is a partner, because getting it right the first time is cheaper than opening a wall.

    Two-story wood framing at golden hour on a sloped lot, stud walls and floor joists exposedFrame · Sample photo
  3. 03Rough-inEL. +18'-0"

    Everything hidden gets squared.

    Plumbing, wiring, ductwork, blocking for the cabinets that are not here yet. The rough-in is where a good build separates from a fast one. We walk it with you before insulation goes in, so you see the guts of your own house while you still can.

    Interior of a home under construction, exposed floor joists and stud walls, a carpenter working on the subfloorRough-in · Sample photo
  4. 04FinishTOP OUT

    Then it becomes a room you live in.

    Trim, cabinets, counters, the tile everyone actually notices. The finish is the reward for the boring work underneath it. Same carpenters who framed the house hang the doors, so the people who know where every stud is are the ones fitting the casework to it.

    A finished kitchen with white cabinetry, a farmhouse sink, wood floors and bright corner windowsFinish · Sample photo
SHEET INDEXWhat we build

Four things, done all the way.

If your project is not one of these, we will tell you honestly and point you to someone who does it well.

A-101

Additions

Second stories, rear extensions, in-law suites. We tie new structure into an existing house so the roofline, the floors, and the finishes read as one building, not a bolt-on.

Second story · Extensions · In-law suites
A-201

Kitchens

Full gut renovations. Down to the studs, re-planned for how you actually cook and gather, then rebuilt with cabinetry and trim that fits the house it lives in.

Full gut · Cabinetry · Millwork
A-301

Bathrooms

Waterproofed the right way, the part you cannot see and cannot cut. Tile set to last decades, not until the warranty runs out.

Waterproofing · Tile · Fixtures
S-101

Foundations and structural

Footings, foundations, beams, and the load paths that hold the rest up. When a wall has to come out or a floor has to be leveled, this is the work that makes it safe.

Footings · Beams · Load paths
DATUM +0'-0"Where we build, and how to start

The territory

The river towns, and not much past them.

We stay close so the owner can actually be on your job every week. If it is more than about twenty minutes from Nyack, it is probably not a Stonebridge job, and we will say so.

  • NyackHome base
  • Upper Nyack5 min
  • Piermont8 min
  • Blauvelt10 min
  • Orangeburg12 min
  • Tappan14 min

Start with a conversation

(845) 555-0172

Call the office and you get a person, or send the details below and we call you back, usually the same day.

No hard sell and no phone tree. One call back to figure out if we are the right builder for the job.

Stonebridge Builders · Nyack, NYLic. H-22-0000-00 · Fully insured · 31 yearsPhotos on this page are sample photos. Fictional business, built as a design demo.
Call the office · (845) 555-0172